OUR
ACHIEVEMENTS
Find below some examples of our achievements
Axones Consulting assists companies with railway expertise and technical writing.
Despite its young age, the company already has several missions to its credit and is ready to meet your future needs.
Railway Innovation and Expertise Project
LGVA Infrapôle in Vendôme
Criticality study of the signaling installations of the Atlantic High-Speed Line
Pending the complete regeneration of the TVM 300 of the Atlantic high-speed line starting on 2030 (HPGV project), the Infrapôle wanted to take a long-term view of its production and prioritize the signaling operations to be done until 2030.
Our missions:
- Analyze the incidents that have occurred since 2014
- Diagnose the main causes
- Recommend priority operations to be done between 2020 and 2030
Our deliverables:
- 1 assessment of signaling renewal operations carried out between 2014 and 2020
- 1 statistical analysis of signaling incidents over the period 2014-2018
- 1 report grouping the production priorities for the period 2020-2030 (the priority having been defined on the basis of an analysis of the reliability of signaling installations)
Keywords: Railway expertise, REXSIG, AGRSIG, FAS, reliability, statistics
MESEA
Creating and updating training materials
MESEA Académie trains operators in charge of maintaining the high-speed line Tours-Bordeaux. The training is given by MESEA experts who design the training materials.
MESEA Académie must write and update half of the training materials (the whole training corpus covers nearly 40 lessons) to be ready to start the new training session.
Our missions:
- Create modules by restructuring the content of existing ones to improve readability
- Review the completeness of useful technical notions and adapt them to the level of learners
- Create new modules for targeted audiences based on operating modes, technical data sheets, etc.
Our deliverables:
- 1 module on overhead contact line (OCL) electrical safety (S11) and electrical risk
- 1 module on the Dangerous Area Crossing Authorisation Device (DATZD)
- 2 modules on measuring and replacing an OCL tensioning device
- 3 modules on the replacement of OCL elements (cantilever, insulators, etc.)
- 3 modules on the remote monitoring system (generalities, hypervisor, maintenance)
Keywords: Technical writing, training materials, operating modes, technical data sheets
MESEA Académie trains operators in charge of maintaining the high-speed line Tours-Bordeaux. The training is given by MESEA experts who design the training materials.
MESEA Académie must write and update half of the training materials (the whole training corpus covers nearly 40 lessons) to be ready to start the new training session.
Our missions:
- Create modules by restructuring the content of existing ones to improve readability
- Review the completeness of useful technical notions and adapt them to the level of learners
- Create new modules for targeted audiences based on operating modes, technical data sheets, etc.
Our deliverables:
- 1 module on overhead contact line (OCL) electrical safety (S11) and electrical risk
- 1 module on the Dangerous Area Crossing Authorisation Device (DATZD)
- 2 modules on measuring and replacing an OCL tensioning device
- 3 modules on the replacement of OCL elements (cantilever, insulators, etc.)
- 3 modules on the remote monitoring system (generalities, hypervisor, maintenance)
Keywords: Technical writing, training materials, operating modes, technical data sheets
Engineering Department
External diagnosis of the project management of the CM4 innovation project
In 2014, the electric traction department is leading CM4, an innovation project that has developed an industrial demonstrator of a high-speed contact wire section measurement system. The transition from the industrial phase to the production start-up phase required technical and financial analyses.
Our missions:
- Analyze the various technical reports and summaries written in order to assess the performance of the system installed on the measurement train and the dynamic calibration lorry
- Analyze the impact and risks associated with adding new functionalities to the system never tested in previous phases of the CM4 project
- Analyze the file of passage pending decision on the argumentation and financial aspect (calculation of ROI, NPV…)
- Propose recommendations on documents and presentation strategy
Our deliverables:
- Diagnostics on the deliverables produced
- Draft of technical requirements for measurement systems
- Proposed strategy to build the best case for key decision-makers
Keywords: Innovation, railway expertise, financial analysis, measurement system
Eurailscout France
Analysis of the Overhead Contact Line measurement performance of the UFM160
Specialised in the measurement and analysis of railway infrastructure data, Eurailscout designs and operates measurement vehicles such as the UFM160 to monitor the state of Europe’s rail track infrastructure by recording various parameters (signalling, clearance, track or overhead contact line).
The UFM160 is therefore being analysed to determine whether its overhead contact line (OCL) geometry measurement performance meets SNCF requirements in terms of accuracy and reliability.
The Eurailscout teams, who already have expertise in the processing of acquisition data, are also seeking to deepen their knowledge of the OCL field in order to better interpret the measurement results.
Our missions:
- Analyse and evaluate the performance of OCL geometry measurements based on the various measurement readings and technical reports
- Participate in the improvement of the machines measurement quality in production and the new acquisition systems under development
- Train Eurailscout experts in the OCL field
Our deliverables:
- Briefing notes and reports on measurement results
- Introductory session to OCL infrastructure
Keywords: Railway expertise, performance analysis, measurement systems, overhead contact line
Specialised in the measurement and analysis of railway infrastructure data, Eurailscout designs and operates measurement vehicles such as the UFM160 to monitor the state of Europe’s rail track infrastructure by recording various parameters (signalling, clearance, track or overhead contact line).
The UFM160 is therefore being analysed to determine whether its overhead contact line (OCL) geometry measurement performance meets SNCF requirements in terms of accuracy and reliability.
The Eurailscout teams, who already have expertise in the processing of acquisition data, are also seeking to deepen their knowledge of the OCL field in order to better interpret the measurement results.
Our missions:
- Analyse and evaluate the performance of OCL geometry measurements based on the various measurement readings and technical reports
- Participate in the improvement of the machines measurement quality in production and the new acquisition systems under development
- Train Eurailscout experts in the OCL field
Our deliverables:
- Briefing notes and reports on measurement results
- Introductory session to OCL infrastructure
Keywords: Railway expertise, performance analysis, measurement systems, overhead contact line
Directorate General Idf – Studies Directorate
Support for the operational implementation of the SDMR study platform
The Rolling Stock Master Plan (SDMR) is an industrial program that will enable 720 new or renovated trains to be put into operation by the end of 2021 on RER and suburban lines in the Paris Region. To produce the studies specific to the SDMR project, the Île-de-France General Management has innovated in its way to organize its design office. It has created a platform dedicated to the project and made up of mixed SNCF and SETEC (external engineering office) teams.
Our missions:
- Support in the thinking of the organization of the platform and its initial implementation
- Support in the analysis of the risks related to this new organization
- Provide expertise on the organization and draft the documents necessary for the operational functioning of the platform
Our deliverables:
- Synthesis and control documents
- Organizational note
- Documents necessary for the steering and decision-making bodies
Keywords: Safety, methods, organization, management system, procedure
Technical writing projects
Klapoti
Formalising IT management rules
Klapoti has developed an innovative digital solution to bring strategic issues to the heart of companies. The rapid and successful launch of its software was possible thanks to an Agile approach.
Through the user manual, several test scenarios and feature description sheets, the software’s management rules have been partially formalised.
To date, the exhaustive functioning of the software is only known by the founder and her developer.
In order to ensure the software durability and to prepare for the arrival of new employees, Klapoti wishes to use a method to formalise the existing management rules and the new functionalities.
Our missions:
- Identify the method to describe the management rules
- Select digital solutions to implement this method
- Write the management rules by applying the chosen method and digital solution
Our deliverables:
- Method to formalise IT management rules
- Management rules written in the format co-constructed with the client and in the selected tool
Keywords: Technical writing, formalisation, IT management rules, Agile
Klapoti has developed an innovative digital solution to bring strategic issues to the heart of companies. The rapid and successful launch of its software was possible thanks to an Agile approach.
Through the user manual, several test scenarios and feature description sheets, the software’s management rules have been partially formalised.
To date, the exhaustive functioning of the software is only known by the founder and her developer.
In order to ensure the software durability and to prepare for the arrival of new employees, Klapoti wishes to use a method to formalise the existing management rules and the new functionalities.
Our missions:
- Identify the method to describe the management rules
- Select digital solutions to implement this method
- Write the management rules by applying the chosen method and digital solution
Our deliverables:
- Method to formalise IT management rules
- Management rules written in the format co-constructed with the client and in the selected tool
Keywords: Technical writing, formalisation, IT management rules, Agile
Intercity Division (SNCF Voyageurs)
Transfer of function A of ECM of railway vehicles
The Travellers Committee decided at the end of 2018 that function A of the Entity in Charge of Maintenance (ECM) would be transferred from the Material Directorate to the various Activities.
Our missions:
- Analyze the Project organization and provide recommendations
- Analyze all the documented information in order to produce the documentary corpus essential for ECM certification
Our deliverables:
- 1 project analysis
- 1 ECM manual
- 1 certification file
- 1 corpus of documents specifying future processes
Keywords: Technical writing, ECM directive, documentary corpus
The Travellers Committee decided at the end of 2018 that function A of the Entity in Charge of Maintenance (ECM) would be transferred from the Material Directorate to the various Activities.
Our missions:
- Analyze the Project organization and provide recommendations
- Analyze all the documented information in order to produce the documentary corpus essential for ECM certification
Our deliverables:
- 1 project analysis
- 1 ECM manual
- 1 certification file
- 1 corpus of documents specifying future processes
Keywords: Technical writing, ECM directive, documentary corpus
Project EOLE
Writing of the ATS/ATC reference for NExTEO
With the extension of the RER E towards the west of Paris, a new signalling system (ATS+) has been developed. To understand its operation and in case of maintenance, a dedicated documentation was missing.
Our missions:
- Analyze the documentary heritage related to the ATS/ATC system (more than 10,000 pages)
- Propose a document architecture for the future ATS/ATC repository describing high level technical principles
- Write the deliverable on the basis of this architecture
Our deliverable:
- 1 ATS/ATC technical repository detailing the operation of the systems for project actors and maintainers
NB: This deliverable was produced with Author-it (structured writing software).
Keywords: Technical writing, structured writing, ATS/ATC signalling system, Author-it
Etablishment Maintenance and Works (SNCF Gares & Connexions)
Revision of the document repositories of the Île-de-France Maintenance and Works establishment
As of January 1, 2020, the Technigare establishment was divided into several structures resulting in a reorganization and a rewriting of the existing documentation.
Our missions:
- Analyze and diagnose the documentary corpus
- Produce documentation
- Follow up and control documentary production
Our deliverables:
- 1 Excel file containing the repositories classified according to the client criteria
- 65 repositories updated or rewritten according to the client requirements
- 1 reporting table listing the texts to be produced and their respective completion status
Keywords: Technical writing, documentary corpus, organization
As of January 1, 2020, the Technigare establishment was divided into several structures resulting in a reorganization and a rewriting of the existing documentation.
Our missions:
- Analyze and diagnose the documentary corpus
- Produce documentation
- Follow up and control documentary production
Our deliverables:
- 1 Excel file containing the repositories classified according to the client criteria
- 65 repositories updated or rewritten according to the client requirements
- 1 reporting table listing the texts to be produced and their respective completion status
Keywords: Technical writing, documentary corpus, organization